# 2.16 Fix the entry funnel before you add features

> Chapter 2, Process. Section: Prioritize, tune, check, and keep the record. Guide: https://www.designguide.dev/md/02-process.md#fix-the-entry-funnel-before-you-add-features

Default

**Rule:** Measure where new people stop in the first week, and fix that path before you add a new feature.

**Why:** A new feature reaches only the people who stay. A leak at the start loses people first.  **When not:** A missing feature that blocks the main job is part of the entry path. Build it first.

- Count the people at each step of the first-week path.
- Name the one step with the largest drop.
- Rebuild that step, then measure again.

**Before:** Plan: add a swim workout type. 60% of new people leave before the first log. (It adds a feature and ignores the leak)

**After:** Plan: shorten the path to the first log. Then add the swim workout type. (It fixes the largest drop first)
